Progress on key initiatives in a challenging market

THIRD QUARTER 2015 RESULTS

  • Order intake of €1.7 billion; backlog at €17.5 billion
  • 10% growth in adjusted revenue to €3.1 billion
  • Adjusted operating income from recurring activities2
    up 21% to €292 million, with €232 million in Subsea and €76 million in
    Onshore/Offshore
  • Net income rose to €164 million

2015 OBJECTIVES: OPERATING PROFIT CONFIRMED, REVENUE INCREASED

  • Adjusted Subsea revenue over €5.5 billion, adjusted operating
    income from recurring activities
    5 at around
    €840 million
  • Adjusted Onshore/Offshore revenue over €6 billion, adjusted
    underlying operating income from recurring activities
    2
    between €210 and €230 million

Regulatory News:

On October 27, 2015, Technip’s (Paris:TEC) (ISIN:FR0000131708)
(ADR:TKPPY) Board of Directors approved the third quarter adjusted
consolidated financial statements.

Note: The third quarter 2015 result presented in this press release
was prepared on the adjusted basis described in Technip’s fourth quarter
and full year 2014 results press release. These results reflect the
financial reporting framework used for management purposes.

€ million

(except Diluted Earnings per Share)

  3Q 14   3Q 15   Change   9M 14   9M 15   Change
Adjusted Revenue   2,824.7   3,108.9   10.1%   7,908.6   9,090.6   14.9%
Adjusted Underlying EBITDA1   305.1   371.8   21.9%   788.7   968.5   22.8%
Adjusted Underlying EBITDA Margin   10.8%   12.0%   116bp   10.0%   10.7%   68bp
Adjusted Underlying OIFRA2 241.5 292.0 20.9% 601.4 745.2 23.9%
Adjusted Underlying Operating Margin3 8.5% 9.4% 84bp 7.6% 8.2% 59bp
One-off Charge - (14.4) nm - (584.8) nm
Other including Tax and Financial Effects (27.9) (6.0) nm (35.8) 52.6 nm
Underlying Net Income4   159.5   184.3   15.5%   392.3   475.3   21.2%
Adjusted OIFRA5 241.5 292.0 20.9% 601.4 560.8 nm
Net Income of the Parent Company   131.6   163.9   24.5%   356.5   (56.9)   nm
Diluted Earnings per Share (€)   1.10   1.35   23.2%   2.98   (0.50)   nm
Order Intake   2,211   1,746       12,069   4,757    
Backlog   19,306   17,459       19,306   17,459    

1 Adjusted operating income from recurring activities after
Income/(loss) of equity affiliates excluding exceptional items,
depreciation and amortization. No exceptional items in 3Q15.
2
Adjusted operating income from recurring activities after Income/(loss)
of equity affiliates excluding exceptional items. No exceptional items
in 3Q15.
3 Adjusted operating income from recurring
activities after Income/(loss) of equity affiliates excluding
exceptional items, divided by adjusted revenue. No exceptional items in
3Q15.
4 Net income of the parent company excluding
exceptional items. See annex V.
5 Adjusted operating
income from recurring activities after Income/(loss) of equity
affiliates.

Thierry Pilenko, Chairman and CEO, commented: “Technip’s focus in
the third quarter was first and foremost on execution: of the projects
in our backlog and of our restructuring plan. The results of the quarter
demonstrate progress on both fronts. Our revenues and profits grew and
we are accordingly on track to deliver our full year objectives.

Performance in the quarter

In Subsea, execution ramped up on our major West African projects, which
will occupy a large part of our fleet for the coming quarters. Adjusted
revenues were up roughly 15% with adjusted operating income from
recurring activities at €232 million. In a slow market, order intake was
at a low level and we also continued to seek to balance business
opportunities and risks. Flexible pipe demand in Brazil remains robust
and we have just announced the first order for the Libra field, to
execute the extended well test program, reflecting the investments we
have made in R&D towards this significant pre-salt opportunity.

Onshore/Offshore delivered €76 million of adjusted operating income from
recurring activities on revenues up 6%, with project performance in line
with our assumptions at the end of the second quarter. We successfully
delivered all modules scheduled for shipment in 2015 for Yamal. Key
milestones were achieved at MMHE’s yard for the SK316 and Malikai
projects. Order intake was better than one year ago in the segment at
€1.2 billion with a number of significant new awards for downstream
facilities as well as the contribution of PMC and other reimbursable
projects in our portfolio.

We pursued our restructuring plan in the quarter delivering results
which underpin our savings objectives.

Overall, therefore, we reiterate our profit objectives for the full year
2015 and expect higher revenues than before in both segments.

Market environment and strategy

The expectation of a low oil price for longer means our clients continue
to reduce their new capex. Price deflation in all parts of oil services,
as well as in our supply chain and in raw materials, will help bring
down costs on new projects. While there are pockets of resilience in
offshore and subsea markets, we see more opportunities at the moment in
onshore - in North America as well as in Eastern Europe and in Africa /
Middle East. Overall, we reiterate our expectations for a prolonged and
harsh downturn.

Equally, our clients are closely focused on how to make new projects
viable in this low oil price environment. For Technip, this is reflected
in the strong client response to our initiatives to introduce
value-added technologies and to drive optimization and standardization
into project designs. Clients have also reacted very positively to our
alliance with FMC Technologies: the Forsys Subsea joint venture has been
awarded two integrated front-end studies, thus exceeding our objectives
for 2015 and preparing the ground for an EPCI award in 2016.

Looking forward, we will remain relentlessly focused on our projects, on
reducing our costs and on our core principles around quality and safety.
The coming period will continue to be tough for oil services; however we
remain confident that our strategy will enable us to resist its worst
effects, add value to clients with a broader portfolio of solutions and
so reinforce Technip’s leadership position in the industry.”

I. ORDER INTAKE AND BACKLOG

1. Third Quarter 2015 Order Intake

During third quarter 2015, Technip’s order intake was €1.7
billion. The breakdown by business segment was as follows:

Order Intake1 (€ million)       3Q 2014       3Q 2015
Subsea       1,272       530
Onshore/Offshore 939 1,216
Total       2,211       1,746

1 Order intake includes all projects whose revenues are
consolidated in our adjusted financial statements.

Subsea order intake included new orders for highly technological
flexible pipes and associated equipment, which will be produced in our
Vitoria and Açu manufacturing plants.

In the US Gulf of Mexico, a contract was awarded for the development of
the subsea infrastructure for the Stones project, covering two
production tie-backs, for which flowlines will be welded at our
spoolbase in Mobile, Alabama and installed by the Deep Blue vessel.

Onshore/Offshore order intake included early works related to an
EPC contract in Egypt to modernize and expand the MIDOR refinery, aiming
at improving the production quality of the plant, considered the most
advanced on the continent.

In the Czech Republic, Technip was also awarded an important EPC
contract for a new polyethylene plant, based on INEOS technology, which
will have a capacity of 270,000 tons per year of high density
polyethylene.

This quarter’s order intake included a significant amount of work orders
received from clients on various contracts such as PMC and other service
contracts.

Listed in annex IV (b) are the main contracts announced since July 2015
and their approximate value if publicly disclosed.

2. Backlog by Geographic Area

At the end of third quarter 2015, Technip’s backlog was €17.5
billion, compared with €18.8 billion at the end of second quarter 2015
and €19.3 billion at the end of third quarter 2014.

The geographic split of the backlog is set out in the table below:

Backlog1 (€ million)   June 30, 2015  

September 30,

2015

  Change
Europe, Russia, Central Asia   7,764   7,411   (4.5)%
Africa 3,535 3,303 (6.6)%
Middle East 1,031 896 (13.1)%
Asia Pacific 2,511 2,000 (20.4)%
Americas 3,983 3,849 (3.4)%
Total   18,824   17,459   (7.3)%
 

3. Backlog Scheduling

Estimated Scheduling

as of September 30, 2015 (€ million)

  Subsea  

Onshore/Offshore

  Group
2015 (3 months)   1,301   1,476   2,777
2016 4,231 4,422 8,653
2017 and beyond 2,890 3,139 6,029
Total   8,422   9,037   17,459
 

1 Backlog includes all projects whose revenues are
consolidated in our adjusted financial statements.

II. THIRD QUARTER 2015 OPERATIONAL & FINANCIAL HIGHLIGHTS – ADJUSTED
BASIS

On July 6th, the Group announced the launch of a
restructuring plan addressing the downturn in the oil and gas market.
Further details of the charge taken in the third quarter are given in
note II.4, with additional comments where appropriate in the segment
highlights.

1. Subsea

Subsea main operations for the quarter were as follows:

  • In the Americas:

    • In the US Gulf of Mexico, the Deep Blue successfully
      completed the third installation trip for the Julia project and
      the tieback to the Pompano fixed platform in the Amethyst field;
      meanwhile welding activities continued on the Kodiak project.
    • In Brazil, flexible pipe production continued for the
      pre-salt fields of Lula Alto, Iracema Norte, Iracema Sul, Sapinhoá
      & Lula Nordeste and Sapinhoá Norte at our manufacturing plants in
      Vitoria and Açu.
  • In the North Sea, the North Sea Atlantic completed the
    pre-installation of new risers for the Quad 204 project, before it
    arrived in Australia, where it will work on the Wheatstone project.
    Very good progress was also observed on Kraken with umbilicals
    delivered on time. In Norway, the North Sea Giant completed
    installation of Åsgard Subsea Compression modules.
  • In Asia Pacific, the G1201 progressed on the Malikai project in
    Malaysia, while the Deep Energy successfully completed its offshore
    campaign on the Prelude project in Australia and transited to West
    Africa. Engineering and procurement phases continued on the Jangkrik
    and Bangka projects in Indonesia, for which manufacturing of flexible
    pipes is progressing at Asiaflex.
  • In West Africa, the Deep Energy started working on the Block
    15/06 development in Angola, installing rigid pipes welded at our
    spoolbase in Dande, while the Deep Pioneer and the Deep Orient
    completed their offshore campaigns, moving respectively to Moho Nord
    and Wheatstone. In Congo, the G1200 was mobilized on Moho Nord, while
    engineering and procurement continued on T.E.N. in Ghana and Kaombo in
    Angola.

Overall, the Group vessel utilization rate for the third quarter
of 2015 was 89%, compared with 86% for the third quarter of 2014, and in
line with the 89% seen in the second quarter of 2015.

Subsea financial performance is set out in the following table:

€ million   3Q 2014   3Q 2015   Change
Subsea      
Adjusted Revenue 1,348.3 1,547.0 14.7%
Adjusted EBITDA 246.5 302.4 22.7%
Adjusted EBITDA Margin 18.3% 19.5% 127bp
Adjusted OIFRA after Income/(Loss) of Equity Affiliates* 193.0 232.0 20.2%
Adjusted Operating Margin   14.3%   15.0%   68bp

* No one-off charge accounted in Subsea adjusted operating income from
recurring activities.

2. Onshore/Offshore

Onshore/Offshore main operations for the quarter were as follows:

  • In the Middle East, construction for the Halobutyl elastomer
    facility in Saudi Arabia neared completion; fabrication of the FMB
    platforms for Qatar continued and activity ramped up on the Umm Lulu
    complex in Abu Dhabi. Additionally, PMC activity progressed, notably
    for Nasr Phase II Full Field Development in Abu Dhabi and for
    upgrading the Basra refinery in Iraq.
  • In Asia Pacific, the topsides of the central processing
    platform sailed away for Block SK316, while Malikai tension leg
    platform (TLP) topsides were successfully mated onto the hull at the
    MMHE yard in Malaysia. On the RAPID project, also in Malaysia, our PMC
    team was fully mobilized to support the construction of the project
    installations. In Korea, the turret-mooring system was successfully
    installed onto the Prelude FLNG hull. Meanwhile, in India,
    construction continued on the Mangalore purified terephthalic acid
    (PTA) plant and we neared completion of the Heera Redevelopment (HRD)
    process platform.
  • In Europe and Russia, the first pipe rack module for the
    initial LNG train was successfully shipped and installed onto its
    foundations for the Yamal LNG project, while electrical substations
    safely navigated to Sabetta after transit through the Bering Strait –
    an industry first. They are now on their foundations. Process modules
    are under construction in Chinese yards. Overall, we successfully
    delivered all modules scheduled for shipment in 2015. Elsewhere,
    engineering continued on the Duslo ammonia plant in Slovakia, while in
    Bulgaria, the Burgas H-Oil project was handed over to the client.
  • In the Americas, engineering and procurement activities
    progressed for Sasol’s world-scale ethane cracker and derivative
    complex near Lake Charles, Louisiana, while construction continued for
    the CPChem polyethylene plant in Texas and neared completion for the
    Ethylene XXI petrochemical complex in Mexico. At the same time, the
    construction of topsides ramped up on the Juniper project in Trinidad
    and Tobago.

This quarter, no one-off charge linked to the restructuring plan was
taken in Onshore/Offshore operating income from recurring activities.
All restructuring costs were booked in non-current operating result (see
note II.4).

Onshore/Offshore financial performance is set out in the
following table:

€ million   3Q 2014   3Q 2015   Change
Onshore/Offshore      
Adjusted Revenue 1,476.4 1,561.9 5.8%
Adjusted OIFRA after Income/(Loss) of Equity Affiliates* 69.6 75.5 8.5%
Adjusted Operating Margin   4.7%   4.8%   12bp

* No one-off charge accounted in Onshore/Offshore adjusted operating
income from recurring activities in 3Q 2015.

3. Group

The Group’s adjusted operating income from recurring activities after
income/(loss) of equity affiliates
, including Corporate charges of
€16 million, is set out in the following table:

€ million   3Q 2014   3Q 2015   Change
Group      
Adjusted Revenue 2,824.7 3,108.9 10.1%
Adjusted OIFRA after Income/(Loss) of Equity Affiliates* 241.5 292.0 20.9%
Adjusted Operating Margin   8.5%   9.4%   84bp

* No one-off charge accounted in adjusted operating income from
recurring activities in 3Q 2015.

In the third quarter of 2015, compared to a year ago, the estimated
translation impact from foreign exchange was a positive €183
million on adjusted revenue and a positive €25 million on adjusted
operating income from recurring activities after income/(loss) of equity
affiliates.

4. Adjusted Non-Current Items and Group Net Income

Adjusted non-current operating items of €(14) million were booked in the
quarter, reflecting the restructuring plan announced on July 6th,
taking total one-off charges booked in respect to the plan to €585
million out of the total estimated charge of €650 million.

Adjusted financial result in the third quarter of 2015 included
mainly €26 million of interest expense on long and short-term debt and a
non-current charge of €11 million taken against our investment in MHB1.

€ million (except Diluted Earnings per Share and Diluted Number of
Shares)
  3Q 2014   3Q 2015   Change
Adjusted OIFRA after Income/(Loss) of Equity Affiliates*   241.5   292.0   20.9%
Adjusted Non-Current Operating Result (33.8) (14.0) (58.6)%
Adjusted Financial Result (19.1) (39.2) 105.2%
Adjusted Income Tax Expense (55.4) (70.3) 26.9%
Adjusted Effective Tax Rate 29.4% 29.4% 6bp
Adjusted Non-Controlling Interests (1.6) (4.6) 187.5%
Net Income of the Parent Company 131.6 163.9 24.5%
Underlying Net Income 159.5 184.3 15.5%
Diluted Number of Shares 124,840,404 125,439,384 0.5%
Diluted Earnings per Share (€)   1.10   1.35   23.2%

* No one-off charge accounted in adjusted operating income from
recurring activities in 3Q 2015.

5. Adjusted Cash Flow and Statement of Consolidated Financial Position

As of September 30, 2015, the adjusted net cash position was
€1,301 million, compared with €1,415 million as of June 30, 2015.

Adjusted Cash2 as of June 30, 2015       3,976.2
Adjusted Cash Generated from/(used in) Operating Activities       40.3
Adjusted Cash Generated from/(used in) Investing Activities (69.5)
Adjusted Cash Generated from/(used in) Financing Activities (1.0)
Adjusted FX Impacts       (143.8)
Adjusted Cash2 as of September 30, 2015       3,802.2
 

Adjusted capital expenditures for the third quarter of
2015 were €74 million, compared with €77 million one year ago.

The Group’s balance sheet remains robust and liquid. Adjusted shareholders’
equity of the parent company
as of September 30, 2015, was
€4,387 million, compared with €4,363 million as of December 31, 2014.

1 MHB: Malaysia Marine and Heavy Engineering Holdings Berhad
listed in Malaysia on Bursa Malaysia, of which Technip holds 8.5%.
2
Adjusted cash and cash equivalents, including bank overdrafts.

III. 2015 OBJECTIVES: OPERATING PROFIT CONFIRMED, REVENUE INCREASED

  • Adjusted Subsea revenue over €5.5 billion, adjusted operating
    income from recurring activities
    1 at around
    €840 million
  • Adjusted Onshore/Offshore revenue over €6 billion, adjusted
    underlying operating income from recurring activities
    2
    between €210 and €230 million

1 Adjusted operating income from recurring activities after
Income/(Loss) of Equity Affiliates.
2 Adjusted operating
income from recurring activities after Income/(Loss) of Equity
Affiliates excluding exceptional items.

°
° °

The information package on Third Quarter 2015 results includes this
press release and the annexes which follow, as well as the presentation
published on Technip’s website: www.technip.com

NOTICE

Today, Thursday, October 29, 2015, Chairman and CEO Thierry Pilenko,
along with Group CFO Julian Waldron, will comment on Technip’s results
and answer questions from the financial community during a conference
call in English starting at 10:00 a.m. Paris time.

To participate in the conference call, you may call any of the following
telephone numbers approximately 5 - 10 minutes prior to the scheduled
start time:

France / Continental Europe: +33 (0) 1 70 77 09 43
UK: +44 (0)
203 367 9461
USA: +1 855 402 7762

The conference call will also be available via a simultaneous,
listen-only audio-cast on Technip’s website.

A replay of this conference call will be available approximately two
hours following the conference call for three months on Technip’s
website and at the following telephone numbers:

      Telephone Numbers       Confirmation Code
France / Continental Europe: +33 (0) 1 72 00 15 00 296501#
UK: +44 (0) 203 367 9460 296501#
USA: +1 877 642 3018 296501#
 

Cautionary note regarding forward-looking statements

This press release contains both historical and forward-looking
statements. These forward-looking statements are not based on historical
facts, but rather reflect our current expectations concerning future
results and events, and generally may be identified by the use of
forward-looking words such as “believe”, “aim”, “expect”, “anticipate”,
“intend”, “foresee”, “likely”, “should”, “planned”, “may”, “estimates”,
“potential” or other similar words. Similarly, statements that describe
our objectives, plans or goals are or may be forward-looking statements.
These forward-looking statements involve known and unknown risks,
uncertainties and other factors that may cause our actual results,
performance or achievements to differ materially from the anticipated
results, performance or achievements expressed or implied by these
forward-looking statements. Risks that could cause actual results to
differ materially from the results anticipated in the forward-looking
statements include, among other things: our ability to successfully
continue to originate and execute large services contracts, and
construction and project risks generally; the level of
production-related capital expenditure in the oil and gas industry as
well as other industries; currency fluctuations; interest rate
fluctuations; raw material (especially steel) as well as maritime
freight price fluctuations; the timing of development of energy
resources; armed conflict or political instability in the
Arabian-Persian Gulf, Africa or other regions; the strength of
competition; control of costs and expenses; the reduced availability of
government-sponsored export financing; losses in one or more of our
large contracts; U.S. legislation relating to investments in Iran or
elsewhere where we seek to do business; changes in tax legislation,
rules, regulation or enforcement; intensified price pressure by our
competitors; severe weather conditions; our ability to successfully keep
pace with technology changes; our ability to attract and retain
qualified personnel; the evolution, interpretation and uniform
application and enforcement of International Financial Reporting
Standards (IFRS), according to which we prepare our financial statements
as of January 1, 2005; political and social stability in developing
countries; competition; supply chain bottlenecks; the ability of our
subcontractors to attract skilled labor; the fact that our operations
may cause the discharge of hazardous substances, leading to significant
environmental remediation costs; our ability to manage and mitigate
logistical challenges due to underdeveloped infrastructure in some
countries where we are performing projects.

Some of these risk factors are set forth and discussed in more
detail in our Annual Report. Should one of these known or unknown risks
materialize, or should our underlying assumptions prove incorrect, our
future results could be adversely affected, causing these results to
differ materially from those expressed in our forward-looking
statements. These factors are not necessarily all of the important
factors that could cause our actual results to differ materially from
those expressed in any of our forward-looking statements. Other unknown
or unpredictable factors also could have material adverse effects on our
future results. The forward-looking statements included in this release
are made only as of the date of this release. We cannot assure you that
projected results or events will be achieved. We do not intend, and do
not assume any obligation to update any industry information or
forward-looking information set forth in this release to reflect
subsequent events or circumstances.

****

This press release does not constitute an offer or invitation to
purchase any securities of Technip in the United States or any other
jurisdiction. Securities may not be offered or sold in the United States
absent registration or an exemption from registration. The information
contained in this presentation may not be relied upon in deciding
whether or not to acquire Technip securities.

This presentation is being furnished to you solely for your
information, and it may not be reproduced, redistributed or published,
directly or indirectly, in whole or in part, to any other person.
Non-compliance with these restrictions may result in the violation of
legal restrictions of the United States or of other jurisdictions.

****

°
° °

Technip is a world leader in project management, engineering and
construction for the energy industry.

From the deepest Subsea oil & gas developments to the largest and most
complex Offshore and Onshore infrastructures, our 36,000 people are
constantly offering the best solutions and most innovative technologies
to meet the world’s energy challenges.

Present in 48 countries, Technip has state-of-the-art industrial assets
on all continents and operates a fleet of specialized vessels for
pipeline installation and subsea construction.

Technip shares are listed on the Euronext Paris exchange, and its ADR is
traded in the US on the OTCQX marketplace as an American Depositary
Receipt (OTCQX: TKPPY).

OTC ADR ISIN: US8785462099

OTCQX: TKPPY

ISIN: FR0000131708

ANNEX I (a) 1

ADJUSTED CONSOLIDATED STATEMENT OF INCOME

   
Third Quarter

Not audited

9 Months

Not audited

€ million (except Diluted Earnings per Share and Diluted Number of
Shares)
  2014   2015   Change   2014   2015   Change
Revenue   2,824.7   3,108.9   10.1%   7,908.6   9,090.6   14.9%
Gross Margin   408.2   456.8   11.9%   1,121.6   1,059.4   (5.5)%
Research & Development Expenses (21.2)   (19.4)   (8.5)% (57.2)   (61.0)   6.6%
SG&A and Other (149.4) (150.9) 1.0% (475.6) (459.8) (3.3)%
Share of Income/(Loss) of Equity Affiliates   3.9   5.5   41.0%   12.6   22.2   76.2%
OIFRA after Income/(Loss) of Equity Affiliates   241.5   292.0   20.9%   601.4   560.8   nm
Non-Current Operating Result (33.8) (14.0) (58.6)% (40.3) (417.8) nm
Operating Income   207.7   278.0   33.8%   561.1   143.0   nm
Financial Result (19.1) (39.2) 105.2% (60.8) (106.5) 75.2%
Income/(Loss) before Tax   188.6   238.8   26.6%   500.3   36.5   nm
Income Tax Expense (55.4) (70.3) 26.9% (140.9) (84.2) nm
Non-Controlling Interests (1.6) (4.6) 187.5% (2.9) (9.2) nm
Net Income/(Loss) of the Parent Company   131.6   163.9   24.5%   356.5   (56.9)   nm
                         
Diluted Number of Shares2   124,840,404   125,439,384   0.5%   125,006,534   114,325,725   nm
Diluted Earnings per Share (€)   1.10   1.35   23.2%   2.98   (0.50)   nm

1 Note that statements disclosed in annex I(a) and I(c) do
not report underlying OIFRA. Please refer to annex V, page 18, for the
underlying net income reconciliation.
2 As per IFRS,
diluted earnings per share are calculated by dividing profit or loss
attributable to the Parent Company’s Shareholders, restated for
financial interest related to dilutive potential ordinary shares, by the
weighted average number of outstanding shares during the period, plus
the effect of dilutive potential ordinary shares related to the
convertible bonds, dilutive stock options and performance shares
calculated according to the “Share Purchase Method” (IFRS 2), less
treasury shares. In conformity with this method, anti-dilutive stock
options are ignored in calculating EPS. Dilutive options are taken into
account if the subscription price of the stock options plus the future
IFRS 2 charge (i.e. the sum of annual charge to be recorded until the
end of the stock option plan) is lower than the average market share
price during the period. As the Group net income is a loss at 9 months,
share subscription options, performance shares and convertible bonds
have an anti-dilutive effect.

CONSOLIDATED REVENUE AND NET INCOME

       
Third Quarter

Not audited

  9 Months

Not audited

€ million   2014   2015   Change   2014   2015   Change
Revenue 2,695.1   2,608.6   (3.2)% 7,537.0   7,945.0   5.4%
Net Income/(Loss) of the Parent Company   131.6   163.9   24.5%   356.5   (56.9)   nm
 

ANNEX I (b)

FOREIGN CURRENCY CONVERSION RATES

       
Closing Rate as of   Average Rate of
    Dec. 31, 2014   Sep. 30, 2015   3Q 2014   3Q 2015   9M 2014   9M 2015
USD for 1 EUR   1.21   1.12   1.33   1.11   1.36   1.11
GBP for 1 EUR   0.78   0.74   0.79   0.72   0.81   0.73
BRL for 1 EUR   3.22   4.48   3.01   3.94   3.10   3.52
NOK for 1 EUR   9.04   9.52   8.27   9.14   8.28   8.81
       

ANNEX I (c) 1

ADJUSTED ADDITIONAL INFORMATION BY BUSINESS SEGMENT

       
Third Quarter

Not audited

  9 Months

Not audited

€ million   2014   2015   Change   2014   2015   Change

SUBSEA

       
Revenue 1,348.3 1,547.0 14.7% 3,590.1 4,388.4 22.2%
Gross Margin 255.3 301.0 17.9% 638.0 841.3 31.9%
OIFRA after Income/(Loss) of Equity Affiliates 193.0 232.0 20.2% 437.2 647.5 48.1%
Operating Margin 14.3% 15.0% 68bp 12.2% 14.8% 258bp
Depreciation and Amortization (53.5) (70.4) 31.6% (159.5) (194.1) 21.7%
EBITDA 246.5 302.4 22.7% 596.7 841.6 41.0%
EBITDA Margin   18.3%   19.5%   127bp   16.6%   19.2%   256bp

ONSHORE/OFFSHORE

Revenue 1,476.4 1,561.9 5.8% 4,318.5 4,702.2 8.9%
Gross Margin 152.9 155.8 1.9% 483.6 218.1 nm
OIFRA after Income/(Loss) of Equity Affiliates 69.6 75.5 8.5% 228.3 (32.2) nm
Operating Margin 4.7% 4.8% 12bp 5.3% (0.7)% nm
Depreciation and Amortization   (10.1)   (9.4)   (6.9)%   (27.8)   (29.2)   5.0%

CORPORATE

OIFRA after Income/(Loss) of Equity Affiliates (21.1) (15.5) (26.5)% (64.1) (54.5) (15.0)%
Depreciation and Amortization   -   -   -   -   -   -

1 Note that statements disclosed in annex I(a) and I(c) do
not report underlying OIFRA. Please refer to annex V, page 18, for the
underlying net income reconciliation.

ANNEX I (d)

ADJUSTED REVENUE BY GEOGRAPHICAL AREA

       
Third Quarter

Not audited

  9 Months

Not audited

€ million   2014   2015   Change   2014   2015   Change
Europe, Russia, Central Asia   837.6   1,202.9   43.6%   2,547.2   3,385.6   32.9%
Africa   335.5   428.2   27.6%   815.2   1,371.9   68.3%
Middle East   290.3   193.0   (33.5)%   945.2   698.2   (26.1)%
Asia Pacific   543.5   581.6   7.0%   1,455.5   1,540.5   5.8%
Americas   817.8   703.2   (14.0)%   2,145.5   2,094.4   (2.4)%
TOTAL   2,824.7   3,108.9   10.1%   7,908.6   9,090.6   14.9%
       

ANNEX II

ADJUSTED CONSOLIDATED STATEMENT OF FINANCIAL POSITION

   
Dec. 31, 2014

Audited

Sep. 30, 2015

Not audited

€ million    
Fixed Assets 6,414.2 6,442.0
Deferred Tax Assets   391.0   454.8
Non-Current Assets   6,805.2   6,896.8
Construction Contracts – Amounts in Assets 756.3 973.1
Inventories, Trade Receivables and Other 3,297.0 3,458.2
Cash & Cash Equivalents   3,738.3   3,802.2
Current Assets   7,791.6   8,233.5
Assets Classified as Held for Sale   3.2   27.7
Total Assets   14,600.0   15,158.0
         
Shareholders’ Equity (Parent Company) 4,363.4 4,386.6
Non-Controlling Interests   11.8   16.7
Shareholders’ Equity   4,375.2   4,403.3
Non-Current Financial Debts 2,356.6 1,637.4
Non-Current Provisions 232.9 243.4
Deferred Tax Liabilities and Other Non-Current Liabilities   249.1   249.4
Non-Current Liabilities   2,838.6   2,130.2
Current Financial Debts 256.4 864.0
Current Provisions 328.3 399.9
Construction Contracts – Amounts in Liabilities 2,258.2 1,954.8
Trade Payables & Other   4,543.3   5,405.8
Current Liabilities   7,386.2   8,624.5
Total Shareholders’ Equity & Liabilities   14,600.0   15,158.0
         
Net Cash Position   1,125.3   1,300.8
 
Adjusted Statement of Changes in Shareholders’ Equity (Parent
Company)
Not audited (€ million):
Shareholders’ Equity as of December 31, 2014 4,363.4
Net Income (56.9)
Other Comprehensive Income 121.4
Capital Increase 158.2
Treasury Shares 3.7
Dividends Paid (225.8)
Other 22.6
Shareholders’ Equity as of September 30, 2015 4,386.6
 

ANNEX III (a)

ADJUSTED CONSOLIDATED STATEMENT OF CASH FLOWS

 
9 Months

Not audited

€ million   2014   2015
Net Income/(Loss) of the Parent Company 356.5     (56.9)  
Depreciation & Amortization of Fixed Assets 187.3 266.1
Stock Options and Performance Share Charges 29.1 19.9
Non-Current Provisions (including Employee Benefits) 14.6 145.3
Deferred Income Tax 25.3 (72.8)
Net (Gains)/Losses on Disposal of Assets and Investments 6.8 (28.3)
Non-Controlling Interests and Other 15.6 13.4
 
Cash Generated from/(used in) Operations 635.2 286.7
 
Change in Working Capital Requirements (225.8) 123.0
 
Net Cash Generated from/(used in) Operating Activities 409.4 409.7
                 
Capital Expenditures (263.0) (218.2)
Proceeds from Non-Current Asset Disposals 29.6 5.2
Acquisitions of Financial Assets (35.6) (2.3)
Acquisition Costs of Consolidated Companies, Net of Cash Acquired (5.9) (31.7)
 
Net Cash Generated from/(used in) Investing Activities (274.9) (247.0)
                 
Net Increase/(Decrease) in Borrowings 185.2 (102.7)
Capital Increase 11.5 21.3
Dividends Paid (206.5) (88.9)
Share Buy-Back and Other (41.8) (5.8)
 
Net Cash Generated from/(used in) Financing Activities (51.6) (176.1)
                 
Net Effects of Foreign Exchange Rate Changes 99.1 78.2
 
Net Increase/(Decrease) in Cash and Cash Equivalents 182.0 64.8
                 
Bank Overdrafts at Period Beginning (2.4) (0.9)
Cash and Cash Equivalents at Period Beginning 3,205.4 3,738.3
Bank Overdrafts at Period End (2.4) -
Cash and Cash Equivalents at Period End 3,387.4 3,802.2
182.0 64.8
 

ANNEX III (b)

ADJUSTED CASH & FINANCIAL DEBTS

   
€ million   Dec. 31, 2014

Audited

  Sep. 30, 2015

Not audited

Cash Equivalents 1,809.4 1,968.4
Cash 1,928.9 1,833.8
Cash & Cash Equivalents (A)   3,738.3   3,802.2
Current Financial Debts 256.4 864.0
Non-Current Financial Debts 2,356.6 1,637.4
Gross Debt (B)   2,613.0   2,501.4
Net Cash Position (A – B)   1,125.3   1,300.8
 

ANNEX IV (a)

BACKLOG BY BUSINESS SEGMENT

     
€ million   As of

Dec. 31, 2014

Audited

  As of

Sep. 30, 2015

Not audited

  Change
Subsea 9,727.8 8,422.0 (13.4)%
Onshore/Offshore 11,208.4 9,036.9 (19.4)%
Total   20,936.2   17,458.9   (16.6)%
 

ANNEX IV (b)
CONTRACT AWARDS
Not audited

The main contracts we announced during third quarter 2015 were
the following:

Subsea Segment:

  • Engineering, procurement, construction, installation and commissioning
    contract for the tie-in of PETRONAS first Floating Liquefied Natural
    Gas (PFLNG1) facility to KAKG-A platform, covering the procurement and
    installation of a 3.2-kilometer flexible flowline from the existing
    KAKG-A central processing platform in Kanowit field to the PFLNG1
    riser: PETRONAS Carigali, Kanowit field, 200 kilometers offshore
    Bintulu, East Malaysia,
  • Engineering, procurement, installation and commissioning contract for
    D18 Project, part of the five-year Framework Agreement signed with
    PETRONAS in late 2014. The project covers the procurement and
    installation of two 8’’ water injection flexible pipes totaling 9.5
    kilometers: PETRONAS Carigali Sdn Bhd (PCSB), East Malaysia.

Onshore/Offshore Segment:

  • Browse floating liquefied natural gas (FLNG) project, which covers the
    realization and installation of three FLNG units. The contract awarded
    covers the front-end engineering design (FEED) elements of the Browse
    FLNG project. A second contract covering the engineering, procurement,
    construction and installation, awarded to Technip Samsung Consortium,
    is subject to a final investment decision by the client: Shell Gas
    & Power Developments BV & Woodside Energy Limited,
    Brecknock,
    Calliance and Torosa fields in the Browse Basin, 425 kilometers North
    of Broome, Western Australia,
  • Project Management Consultancy (PMC) contract for a project designed
    to transport gas from the Shah Deniz field to the European market. The
    services will include the overall project and site management,
    procurement and subcontracting for all the EPC packages throughout the
    engineering, procurement and construction phases, as well as warranty
    management and project close-out: Trans Adriatic Pipeline (TAP) AG,
    Italy, Albania and Greece,
  • Contract for a project to modernize and expand the MIDOR refinery,
    aiming at improving the production quality of the plant, considered
    the most advanced on the African continent: Midor (Middle East Oil
    Refinery), near Alexandria, Egypt,
  • Contract for the modernization project of the Assiut refinery,
    designed to refine the “bottom of the barrel” and aiming at maximizing
    diesel production: Egyptian General Petroleum Corporation (EGPC)
    and Assiut Oil Refining Company (ASORC), Upper Egypt,
  • Important contract covering the engineering, procurement and
    construction (EPC) of a new Polyethylene Plant (PE3). Based on INEOS
    technology, the new unit will have a capacity of 270,000 t/y of high
    density polyethylene: Unipetrol, Czech Republic.

Since September 30, 2015, Technip has also announced the award of
the following contracts, which were included in the backlog as of
September 30, 2015:

Subsea Segment:

  • Supply contract to the Block 15/06 East Hub Development at a water
    depth of 450-600 meters, covering 15 kilometers of dynamic and static
    steel tube umbilicals: ENI S.p.A., 350 kilometers north of Luanda,
    Angola,
  • Contract for the development of subsea infrastructure for the Stones
    project, including two subsea production tie-backs to the Floating
    Production, Storage and Offloading (FPSO) vessel: Shell Offshore
    Inc., Walker Ridge area, US Gulf of Mexico,
  • Important contract covering the engineering, procurement, fabrication,
    installation and commissioning of three flexible pipes totaling 9.9
    kilometers. The flexible pipes consist of two production risers and
    flowlines and one gas export riser and flowline, connecting shallow
    water platforms to a new FPSO in the Layang Field: JX Nippon Oil
    and Gas Exploration Ltd, offshore Sarawak, Malaysia.

Onshore/Offshore Segment:

  • Contract to supply three hydrogen reformers as part of the hydrogen
    production facility at PETRONAS’ Refinery and Petrochemical Integrated
    Development (RAPID) project: PETRONAS, state of Johor, Malaysia,
  • Contract to supply proprietary ethylene technology and Process Design
    Package (PDP) for a 1,000 KTA grassroots ethane cracker for which a
    final investment decision by client expected in 2016 or 2017: PTTGC America
    LLC (PTTGCA), a subsidiary of PTT Global Chemical Thailand’s largest
    integrated petrochemical and refining company, the cracker will be
    located in Belmont County, Ohio, USA.

Since September 30, 2015, Technip has also announced the award of
the following contract, which was not included in the backlog as
of September 30, 2015:

Subsea Segment:

  • Substantial contract covering the supply of high-end flexible pipes
    for the Libra Extended Well Test field including: 8" oil production,
    6" service and 6" gas injection flexible pipes. This project is one of
    the first steps of the Libra giant field development. The highly
    technological flexible pipes will be produced at Technip's
    manufacturing sites in Vitoria and Açu, Brazil: Libra Oil & Gas BV,
    a consortium led by Petrobras Netherland BV (PNBV, 40%) and partners:
    Shell (20%), Total (20%), CNOOC (10%) and CNPC (10%),
    located
    in the Santos Basin pre-salt area, Brazil.

ANNEX V

UNDERLYING NET INCOME RECONCILIATION

Not audited

   
€ million Third Quarter 9 Months
2015   2015
       
Net Income of the Parent Company 163.9   (56.9)
One-off charges in OIFRA - 184.4
Charges from Non-Current Activities 14.4 400.4
Other (0.4) 17.4
Taxes & Financial Result 6.4   (70.0)
Underlying Net Income 184.3   475.3
 

Analyst and Investor Relations
Kimberly Stewart, +33 (0) 1
47 78 66 74
kstewart@technip.com
or
Aurélia
Baudey-Vignaud, +33 (0) 1 85 67 43 81
abaudeyvignaud@technip.com
or
Michèle
Schanté, +33 (0) 1 47 78 67 32
mschante@technip.com
or
Public
Relations

Laure Montcel, +33 (0)1 49 01 87 81
Delphine
Nayra, +33 (0)1 47 78 34 83
press@technip.com
or
Technip’s
website
http://www.technip.com
Technip’s
IR website
http://investors-en.technip.com
Technip’s
IR mobile website
http://investors.mobi-en.technip.com

Source: Business Wire
(October 29, 2015 - 2:00 AM EDT)

News by QuoteMedia

www.quotemedia.com

Share: